Question 8002 of 234 · California Wastewater Operator Exam

A wastewater treatment plant with a primary process and a design flow of 0.8 MGD is classified as

Exactly one answer is correct.

Show solution

Correct answer to question 8002

  • B: Class I

Explanation

23 CCR 3675 classifies primary plants of 1.0 MGD or less as Class I. A primary plant with design flow over 1.0 through 5.0 MGD is Class II.

Next to question ›