Before digging in California, an operator should contact Underground Service Alert (811). How much notice is typically required?
Exactly one answer is correct.
You got of questions right. Here on the question pages nobody remembers which ones you got wrong. The trainer saves your progress and asks the mistakes again until they stick.
Or free: the 10 questions most people get wrong
Show solution
Correct answer to question 4027
- D: At least 2 working days before digging
Explanation
Except in an emergency, an excavator must notify the regional notification center (811) at least two working days, and not more than 14 calendar days, before digging. The day of notification does not count. Utilities then mark their underground lines.
More questions: Drinking Water Regulations, Management and Safety
- 4028Which traffic control practice protects workers at a street excavation?
- 4029Which activity is part of the preventive maintenance program?
- 4030Which of the following should be included in a water system's emergency response plan?
- 4031Why is record keeping of a fire hydrant testing program important?
- 4001What is the main purpose of the Safe Drinking Water Act (SDWA)?
- 4002What is a maximum contaminant level (MCL)?